Skip to main content

Creating and Finalizing a Summative Report

Learn how to create, review, send, and finalize a summative report in Lebra Ascend — including attaching observations, walkthroughs, and notes as evidence.

Written by Maxwell Bass

A summative evaluation is the final evaluation document for an employee, bringing together observations, walkthroughs, notes, recognitions, ratings, and narrative feedback into one comprehensive assessment. This article walks administrators and evaluators through creating a summative evaluation, requesting the employee's reflection and signature, and finalizing the evaluation.

Before You Begin

By default, before creating a summative evaluation Lebra checks that:

  • At least one completed observation (formal or informal) exists for this employee

  • The employee has an active Growth Plan (PDP/IPLP)

  • The employee has a valid email address on file

If the first two are missing, + Add Summative Evaluation shows "Action unavailable" until they're in place.

Administrators can relax this per role. In Settings → Ascend → Framework, select a role and choose Edit role. The toggle Require supporting items for summative evaluations (on for every role unless you turn it off) controls both the PDP-and-observation check and whether an observation must be selected in Step 1 before you can continue. Turn it off for roles that are evaluated without observations, such as some classified or non-instructional staff.

Note: Summative evaluations are created under a specific framework role and rate the employee against that role's domains and standards. If the employee holds two roles, select the role in the role dropdown on their page first — the evaluation's evidence picker then shows only that role's observations, walkthroughs, and notes, and the finished evaluation counts toward that role's pathway. A two-role employee gets a separate summative per role. See Staff Who Hold Two Framework Roles.


Accessing Summative Evaluations

Steps

  1. Navigate to the employee's profile page.

  2. Select the Summative Evaluations tab.

  3. Review any existing summative evaluations and their current status (Draft, Feedback Requested, Signed by Employee (or Signature Declined), Completed).


Creating a New Summative Evaluation

Steps

  1. Click + Add Summative Evaluation.

  2. The Add summative evaluation window opens with a multi-step form to guide you through the process.

Step 1: Select Evidence and Employee Details

  1. Review the employee's name, building name, and title (pre-filled).

    • Note: Building name and employee title are optional to include.

  2. Select the formal observations you want to include.

  3. Select any informal observations you want to reference.

    • Only completed or shared observations will appear.

  4. If your organization uses In-Person Meetings, select any completed or shared meetings you want to include in the Select In-Person Meetings section.

  5. Select any relevant notes to include in the Select Notes section — notes are attached to the evaluation as evidence.

  6. In Select Recognitions, choose any recognitions the employee received this school year that you want to include. Use Select all to attach every one; the section only appears when the employee has recognitions this year. Selected recognitions are shown to the employee on their reflection page.

  7. If your organization uses Walkthroughs, select any walkthroughs you want to attach as evidence in the Select Walkthroughs section.

    • Only Completed or Shared with Employee walkthroughs from the current school year appear — drafts do not. For staff with two framework roles, only walkthroughs recorded under this evaluation's role are offered. Including walkthroughs is optional.

  8. Click Next to continue. When the role requires supporting items, Next stays unavailable until at least one formal observation, informal observation, or in-person meeting is selected.

Step 2: Rate Standards and Add Narrative Feedback

In this step, you evaluate performance against standards and provide written feedback.

Option 1: Applying AI-Recommended Ratings

  1. Select Apply Lebra Recommended Ratings to generate draft ratings and comments based on evidence from the selected observations, notes, recognitions, and walkthroughs.

  2. Review all AI-generated content carefully and edit as needed.

Option 2: Manually Rating Standards

  1. Expand each domain to view its standards.

  2. Select a rating for each standard.

  3. Add supporting comments to explain your ratings.

  4. Repeat for all standards across all domains.

  5. The overall score updates automatically as ratings are entered.

Scoring warnings

If your district's scoring setup would leave this evaluation without a usable result, amber warnings appear on the scoring and review steps and again when you request a signature or finalize. Examples: "SAI is blank. It carries 12% of the rating and will count as 0," or "The final score doesn't fall in any rating's score range, so this evaluation will have no final rating." They don't block you, but they're worth fixing first.

Administrators can see and resolve the underlying issues in Settings → Ascend → Framework: select the role, expand Scoring & weights, and read the Scoring readiness panel. Issues marked Blocks scoring stop a final rating from being calculated; Needs attention items are gaps that count as zero. Select Check again after making changes. Roles with open issues also show a warning icon in the Framework roles list.

Adding Narrative Descriptions

After rating all standards, scroll down to the narrative sections:

  1. In the Key Strengths text area, describe the employee's primary strengths and positive contributions.

    • Aim for 100-150 words that highlight specific accomplishments and qualities.

  2. In the Areas for Growth text area, describe areas where the employee can continue to develop.

    • Be constructive and specific, focusing on professional development opportunities.

  3. Use the Additional Comments section for any other relevant information not covered elsewhere

Tip: Click the AI Composer icon to get help drafting these sections based on your observations and notes. All content remains fully editable.

Note: Your work saves automatically as you type, but you may also select Save as Draft to exit and return later.

Employee Artifacts

At the bottom of this step, the Employee Artifacts section lists the files the employee uploaded with their Growth Plan progress updates, year-end updates, and submitted self-evaluations for this school year and framework role, with the date and the components each file supports. Select a file to download and open it.

Note: Apply Lebra Recommended Ratings and the AI Composer don't read the contents of these files this school year; they draw on the selected observations, notes, recognitions, and walkthroughs. Open the files yourself when deciding on ratings and narrative.

Click Continue when ready.

Step 3: Review and Request Employee Signature

  1. Review the full summary, including:

    • Employee details

    • Included observations, walkthroughs, notes, and recognitions

    • Overall score and component ratings

    • Narrative feedback

  2. When ready, select Request employee reflection and signature.

  3. Confirm the request to send the evaluation to the employee by email. Any scoring warnings are repeated in the confirmation so you can go back if needed.

    • The employee will receive an email with a secure link to view the evaluation and add their reflection.

Note: email links are valid for 60 days. If a link expires, you can resend the request.

Student Achievement Indicator acknowledgement: if the evaluation includes a Student Achievement Indicator (SAI) value, the employee sees it in a highlighted box on their reflection page and must tick "I have reviewed my Student Achievement Indicator score and confirm that it is correct" before they can sign. Once they do, the evaluation shows "Student Achievement Indicator acknowledged at XX.XX%" with the date. The acknowledgement is cleared automatically if the SAI value is later changed or the evaluation is moved back to draft, so the employee confirms it again.


Finalizing the Summative Evaluation

Steps

  1. Return to the employee's Summative Evaluations tab.

  2. Open the evaluation marked Signed by Employee.

  3. Review the employee's reflection.

  4. From the signed evaluation's action menu, select Complete report. In the modal that opens, review the details (and any scoring warnings) and click Finalize report to confirm.

    • The evaluation status changes to Completed, and the employee receives a confirmation email.

Note: If the employee declines to sign, select Record Signature Declined from the evaluation's action menu. The status changes to Signature Declined, and you can still complete the evaluation.

Important: Once finalized, the evaluation cannot be edited. Make sure all information is correct before finalizing.


Downloading the Evaluation

After finalization, you can download a PDF copy:

  1. Open the completed summative evaluation.

  2. Click the Download PDF button.

Tip: On a completed evaluation, the small ⓘ next to each score opens Rubric details — the component name, the rating level, and your district's rubric description for that level — so you can answer "why this score?" without opening the framework.


Frequently Asked Questions

Can I edit a summative evaluation after sending it for signature?

Yes, as long as the employee hasn't signed yet. Open the evaluation and click "Edit" to make changes. After editing, re-request the employee's input using Request employee reflection.

What if the employee's email link expires?

Email links are valid for 60 days. If the link expires, open the evaluation and select Request employee reflection to send a new email with a fresh link.

Can I delete a summative evaluation?

Yes, you can delete evaluations that are in Draft or Feedback Requested status. Open the evaluation's ⋯ (more) menu and select Delete. Signed and Completed evaluations cannot be deleted.

How is the overall score calculated?

The overall score is automatically calculated based on the individual ratings you assign to each standard, weighted according to your organization's rubric settings. If a warning says no final rating can be calculated, an administrator needs to fix the role's score ranges or weights in Settings → Ascend → Framework (see Scoring warnings above).

Can I create multiple summative evaluations for the same employee?

Yes, you can create multiple summative evaluations for an employee — typically one per evaluation period, and one per framework role for employees who hold two roles. Each role's evaluation rates against that role's framework and pulls from that role's evidence.

Can walkthrough information be pulled into a summative evaluation?

Yes. If your organization uses Walkthroughs, the evidence-selection step (Step 1 above) includes a Select Walkthroughs section where you can attach any of the employee's completed or shared walkthroughs from the current school year as evidence. Attached walkthroughs are listed in the evaluation's review step, and their look-for evidence and general notes are taken into account when you use Apply Lebra Recommended Ratings. See the Walkthroughs article to learn more.

Can recognitions count as evidence?

Yes. Step 1 has a Select Recognitions section listing the employee's recognitions from this school year. Selected recognitions are shown to the employee on their reflection page and are used by Apply Lebra Recommended Ratings alongside observations and notes.

Does Apply Lebra Recommended Ratings read the employee's uploaded artifacts?

Not this school year. The Employee Artifacts list on Step 2 shows every file the employee uploaded with their Growth Plan updates and submitted self-evaluation, with its date and linked components, so you can open them while you rate. The AI draws on the selected observations, notes, recognitions, and walkthroughs.

The employee says they can't submit their reflection.

If the evaluation includes a Student Achievement Indicator, the submit button stays unavailable until they tick the acknowledgement box under the SAI score. Ask them to check the Student Achievement Indicator box on their reflection page.

What if I don't have any observations yet?

By default you must have at least one completed observation before creating a summative evaluation. Complete an observation first, then return to create the summative evaluation — or, for roles that are evaluated without observations, an administrator can turn off Require supporting items for summative evaluations for that role.

Did this answer your question?