Stuck on your Growth Plan? Your district may call it a PDP, IPLP, PGP, or ILP — it's the same thing. Find the message or situation you're seeing below. For the full walkthrough of filling in a plan, see Completing Your Growth Plan.
"I don't have a Growth Plan to fill in"
You can't start a Growth Plan on your own. Your evaluator has to request it first, and that request is what creates the plan and its Submit button.
Sign in to your Staff Portal.
Look at Action Required at the top. If your plan has been requested, you'll see it there with a Complete PDP button (your district's name for the plan appears in place of PDP).
If it isn't there, and there's nothing for it in your Timeline, your evaluator hasn't sent the request yet. Ask them to send it.
Tip: The Milestones list shows when your plan is due, but it isn't a link. A milestone appearing doesn't mean the plan has been requested.
"The Submit button is greyed out"
Submit my PDP stays unavailable until every required part of the plan is filled in. Just above the button, a box headed Before you can submit: lists exactly what's still missing. The most common items:
Message | What to do |
Select at least N components/indicators (or Component is required) | Choose more focus components. Your district sets the minimum. |
Professional growth goals are required / …action steps are required | Fill in both the goal and its action steps. They're separate boxes. |
Student achievement goals are required | Your district requires this section. Fill in the goal and its action steps. |
Signature is required. | Type your full name in the signature box. The signature isn't saved with a draft, so retype it if you came back to the plan later. |
No evaluator is assigned to you yet. | Ask your administrator to assign your evaluator, then reload the page. Your answers are saved. |
"PDP Access Expired"
The link in your email is good for 60 days. After that, the email link shows PDP Access Expired. Your work isn't lost.
Quickest fix: sign in to your Staff Portal and open the plan from Action Required. Opening it from the portal doesn't expire.
Or ask your evaluator to resend the request. You'll get a fresh link.
Note: An old email link can show "expired" even after your plan was approved. That's expected — find the approved plan in your Staff Portal Timeline instead.
"PDP Sent Successfully" when I open my link
Your plan has already been submitted, so the link no longer opens the form. It's with your evaluator. You'll find it in your Staff Portal Timeline, labeled Submitted (waiting for approval) or Approved.
Need to change something? Use Request Edit on the plan in your Timeline. See "I submitted it and need to change something" below.
"No PDP data found"
That link has been replaced or the plan was removed. This usually happens when your evaluator resent the request and a newer email went out. Use the most recent email, or open the plan from Action Required in your Staff Portal. If it isn't there either, check with your evaluator.
"Where did my draft go?"
Your plan saves automatically a couple of seconds after each change, and you can also select Save as Draft. A plan you've started but not submitted shows up in two places in your Staff Portal:
Action Required, with a Complete PDP button — use this to keep working
Your Timeline, labeled Draft with "Your plan is in progress and has not been submitted"
Not there? Check the year dropdown at the top of the portal. It shows the current school year by default.
"I submitted it and need to change something"
In your Staff Portal Timeline, find the plan and select Request Edit.
Your evaluator gets an email. The button changes to Edit requested.
When they allow edits, you're emailed and the plan returns to Action Required with your answers kept.
Make your changes, sign again, and resubmit.
If you see "This PDP can no longer be edited," the plan was submitted or reopened in another tab or by your evaluator. Reload the page to see its current state.
Progress and year-end updates
When your evaluator asks for an update, it appears in Action Required as Update Progress or Submit Year-End Update. The email for a year-end update is titled "Progress Update" and its button says Add my PDP Update — it still opens the year-end form.
Update my PDP is greyed out on the year-end form: the Percentage (0-100%) box under Student Achievement Indicator is empty or outside 0–100, or you haven't typed your signature. Principal and administrator roles see the field marked optional and can leave it blank.
The year-end form doesn't save a draft. If you leave the page, your percentage and any files you added are discarded, so finish it in one sitting. See Submitting Your Year-End Update.
After you submit, you'll see "Your PDP progress has been updated successfully." or "Your PDP Year End Update has been submitted successfully."
If the update link later opens a blank page, open the plan from your Staff Portal Timeline instead.
Still Stuck?
Contact your evaluator first — most Growth Plan problems are fixed by them resending or reopening the plan. For technical issues, email [email protected] with your name, your district, and the exact message you see.